CRDS-21 (Southern Hemisphere Astrometry) 2005 July 4 (DOY 185) Notes prepared by Alan Fey, U.S. Naval Observatory Schedule name: crds21.skd Nominal Start: 12:00 U.T. on 2005 July 4 (DOY 185) first observation at 12:00 U.T. on 1325-558 45-Hh Duration: 24 hours Nominal Stop: 12:00 U.T. on 2005 July 5 (DOY 186) last observation at 12:00 U.T. on 0534-611 45-Hh Correlator: WACO at Washington, DC Station Codes # of tapes # of obs Occupation Code DSS45 T 0.9 306 HARTRAO J 0.9 306 Total number of observations (delay measurements): 306 Total number of scans in the schedule: 306 Purpose ======= Astrometric observations to strengthen the ICRF in the Southern Hemisphere. Schedule ======== This is a new schedule generated by Alan Fey using sked. Correlation =========== This experiment will be correlated at the WACO Correlator. Tapes should be shipped to Washington, DC as soon after the experiment as practical. Special procedures ================== NONE. Summary ======= The following listing is a summary of the observations in this schedule. Average number of obs. per baseline per source (normalized by up-time) = 25.1 Min = 16.3 Max = 36.9 (Baseline 45-Hh on 0743-673) RMS = 5.1 Total time: 1442 minutes ( 24.0 hours). Key: 45=DSS45 Hh=HARTRAO 45 Hh Avg % obs. time: 35 35 35 % cal. time: 3 3 3 % slew time: 19 53 36 % idle time: 41 6 24 total # scans: 306 306 306 # scans/hour : 12 12 12.8 Avg scan (sec): 101 101 101 Total GBytes: 560 560 561 Total GB(M5): 498 498 498 # of tapes : .9 .9 tape change times (hhmm): Total number of tapes: 1.9 Total GBytes (M5) recorded: 996.5 # OF OBSERVATIONS BY BASELINE | 45 Hh StnTotal ---------------------- 45|306 306 306 Hh| 306 306 Number of 2-station scans: 306 Total # of scans, observations: 306 306